The ride consists of a turnaround out of the station, which continues until the two tracks are running side-by-side. The trains then climb the lifthill, and descend the first drop. Two small bunny hills follow, before the trains climb up a larger hill. Another small bunny hill follows before the trains rise up into a turnaround.
The turnarounds go in opposite directions so that the two tracks separate. After the drop from the turnaround, there are two more hills, with the second one turning slightly to allow the tracks to run parallel again, and run adjacent to the out portion of the ride. Three more bunny hills follow before the trains enter individual tunnels that contain the loading block brakes. The trains then return to the station after a total of 11 drops each side.
|